← Interactive website · Research library
NIO Power Swap Station 4.0
A robotized infrastructure system that replaces a compatible battery pack instead of charging it in place
Data snapshot: October 13, 2026. Independent research; not a manufacturer website or buying advice.
How it works
NIO reported a 144-second station swap under its stated operating process, storage for up to 23 packs and multi-brand support designed into Gen 4. A separate charging and station-network ecosystem is required
Scope
Compatible NIO/ONVO vehicles and supported swap partners, subject to battery fit and installed stations; China rollout at announcement
Evidence limits
144 seconds is the manufacturer’s station-process claim, not the total time for travelling to, queuing at, or accessing a station. No NIO-compatible Canadian swap network is verified in this archive